Live Programme · Gantt Schedule

Collaborative Project Management & Planning

Here to help with your planning & project management needs — full-time, or on an ad-hoc basis. We model, programme and manage the built environment, from tender to handover.

NEC3 · NEC4 · JCT compliant
Mon–Fri · 9AM–5PM
(+44) 01403 888 342
Scroll to run the programme · drag to orbit
Tender Planning Construction Programmes NEC3 · NEC4 · JCT 2D & 3D Design Point Cloud Surveys 3D Material Take-offs Claims Assessments
/ Why CPMP

Beautifully flexible. Rigorously compliant.

01

Beautifully Flexible

Full-time or ad-hoc — we fill the gap to meet your contract requirements, scaling to the demands of your programme.

02

NEC3 & NEC4 Compliant

Fully versed in JCT, NEC3 & NEC4 contracts and the precise requirements each of these frameworks demands.

03

Top-Notch Support

We strive to give our customers the support that makes their project a success — start to finish, programme to handover.

/ Your project in good hands

Skilled professionals. Construction organised.

On programme

From piling and treatment works to foundations and fit-out — a snapshot of the projects we keep on programme.

Piling rig at work on site

Skilled Professionals

A team of 20+ Planners who have been in the industry a long time, working with some of the largest companies in the country.

Aerial view of a water treatment works

Effective Planning

Systems developed over many years to work through your project methodically and get the best possible result.

Excavators working on a foundation dig

Project Managed

A vast array of projects delivered — from treatment works, to schools, to highways, to shafts & tunnels.

/ Capabilities

Six disciplines, one programme.

We started off on site, so we understand every stage — and we carry that understanding from the first tender estimate to the final claim.

01

Tender Planning

We work through the different options with you and present the results back as a clear, defensible programme.

02

Construction Planning

We develop your tender programme into a full construction programme and carry out monthly progress updates.

03

2D & 3D Design

We help develop 2D & 3D design, and carry out 3D material take-offs to sharpen your tendering.

04

Project Management

We started off on site, so we bring a multitude of hands-on experience to managing projects of every scale.

05

Site Engineering

Experienced engineers who can survey your site and carry out detailed point cloud surveys.

06

Claims Assessments

Meticulous claims planners who review your project and help present your claims with rigour.

0+
Planners available
0
Core disciplines
0
Contract frameworks · NEC3/4 · JCT
0+
Sectors served
/ Trusted by

We wouldn't be anywhere without our clients.

Thanks to their trust, we've worked on some amazing projects and celebrated some incredible successes — and we look forward to many more.

CMDP — A Costain-MWH Joint Venture
Costain
Balfour Beatty
Bechtel
BAM Nuttall
JGL
London Underground
Ferrovial Agroman
Southern Water
Thames Water
Crossrail
AMEC