Eighteen planners. Two directors. One point of contact.

CPMP Ltd was founded in Horsham in 2020 by Shane Stanford and Ben Cluer. We embed experienced Primavera P6 and NEC planners with contractors and subcontractors on flexible terms, from a single planner two days a month to a full PMO team on a major framework.

Company profile

Built for businesses that need senior planning capability without carrying it full time.

A full-time planner means a salary, a P6 licence, a vehicle and, if you get the contract wrong, an IR35 problem. Most contractors need that capability some of the time and all of it occasionally. CPMP exists for exactly that shape of demand.

Our planners sit with your project teams, on site where the job is, and report to a director who still plans every week. When the work grows, the team grows with it. When it finishes, the cost stops.

18experienced planners
2directors who still plan
20+years in UK civils
7sectors covered
Founded2020, Horsham
Registered asCPMP Ltd
OfficeThe Courtyard, 30 Worthing Road
Horsham, West Sussex, RH12 1SL
HoursMonday to Friday, 9am to 5pm
Where we workSite-based teams across the South East; specialist work UK-wide

What we do

Planning, project management and the engineering around it.

The detail, with who each service is for, is on the services page.

  • Tender planning
  • Construction planning
  • Collaborative planning
  • Claims assessments
  • PMO set-up and PMO functions
  • System development: Primavera and reporting
  • Ad hoc programme updates
  • Ad hoc project management
  • Site engineering
  • AutoCAD
  • Planning and project management training: Primavera, CEMAR, Asta, MS Project

Tools: Primavera P6, Synchro 4D, Asta Powerproject, Microsoft Project, CEMAR, AutoCAD, Revit, Power BI.

The directors

You deal with the people who do the work.

Co-owner and director

Shane Stanford

Shane is a Six Sigma Black Belt planning manager and delay analyst with more than 20 years in UK civil engineering. He has been a director of Stanford Consultants since 2015 and co-owner of CPMP since it was founded in 2020.

He started underground: tunnel engineer and planner on the A3 Hindhead Tunnel with Balfour Beatty from 2008 to 2011, then package manager and project engineer on a run of Balfour Beatty academy builds at Littlehampton, Ormiston Park and Ormiston Gateway. In 2014 he was an SCL tunnel engineer on Crossrail at Farringdon with BAM Nuttall, and from 2014 to 2016 sub-agent and project planner with Joseph Gallagher on the Vauxhall Station step-free access works. From 2016 to 2019 he worked as a senior planner in 4D planning and 3D modelling.

He holds a BTEC Level 7 in forensic delay analysis and leads CPMP's claims, expert witness, P6 implementation and 4D work. Tools: P6, Synchro 4D, Asta, MS Project, CEMAR, AutoCAD and Revit.

Forensic delay analysis, BTEC Level 7Six Sigma Black BeltPrimavera P6, Synchro 4D, Asta, MS Project, CEMAR, AutoCAD, RevitTunnelling, water and wastewater, highways, rail stations, education

Co-owner and director

Ben Cluer

Ben has been a planning engineer since 2001 and runs CPMP's delivery. He leads the planning teams on the ground across the South East, including the site-based planners embedded on a major water and wastewater framework with long-term secured work.

He learned the trade inside the utilities: planning engineer at National Grid from 2001 to 2005, then at Thames Water from 2005 to 2007, before nine years with the planning consultancy 4D from 2007 to 2015. He has run his own planning practice, Ben Cluer Ltd, since 2015 and co-founded CPMP in 2020.

He owns resourcing, continuity and cover: which planner goes to which job, who steps in when someone is on leave, and how a team scales up when a framework gets busy. If you have a CPMP planner on site, Ben is the director checking in on both of you.

Planning engineer since 2001National Grid, Thames Water, 4DSite-based teams across Sussex, Hampshire and KentResourcing, continuity and cover

Projects our directors have delivered

The jobs behind the judgement.

These are the directors' own site and planning roles, before and alongside CPMP, not CPMP contracts. They are why our delay analysis starts from how work is actually built.

2008 to 2011

A3 Hindhead Tunnel

Tunnel engineer and planner, Balfour Beatty
Shane Stanford

2011 to 2014

The Littlehampton Academy

Package manager and project engineer, Balfour Beatty
Shane Stanford

2011 to 2014

Ormiston Park Academy

Package manager and project engineer, Balfour Beatty
Shane Stanford

2011 to 2014

Ormiston Gateway Academy

Package manager and project engineer, Balfour Beatty
Shane Stanford

2014

Crossrail, Farringdon

SCL tunnel engineer, BAM Nuttall
Shane Stanford

2014 to 2016

Vauxhall Station step-free access

Sub-agent and project planner, Joseph Gallagher
Shane Stanford

2001 to 2005

National Grid

Planning engineer
Ben Cluer

2005 to 2007

Thames Water

Planning engineer
Ben Cluer

2007 to 2015

4D, planning consultancy

Planning engineer
Ben Cluer

Current

Water and wastewater framework, South East

Leads the embedded site-based planning teams
Ben Cluer

How we work

Four things you can hold us to.

01

Say it straight

If the programme will not be accepted, or the claim will not stand, we say so before you spend money on it. If a job needs a skill we do not carry, we say that too and point you to someone who does.

02

Site first

Both directors came up through site engineering. Our planners walk the job, talk to the people doing the work and build the logic from what is actually happening, not from the last update.

03

No overhead

You get the capability without the salary, the licence, the vehicle or the IR35 exposure. Two days a month or a full team, up and down as the job needs.

04

Programmes that get accepted

Clause 31.2 content, an honest critical path and a narrative that explains it. The measure of a programme is whether the Project Manager accepts it and the team can run the job from it.

Contractors and clients our planners have worked with

CMDP, a Costain-MWH joint venture
Costain
Balfour Beatty
Bechtel
BAM Nuttall
Joseph Gallagher
London Underground
Ferrovial
Southern Water
Thames Water
Crossrail
AMEC
Anglian Water
McLaren Construction Group
ALS Civil & Mechanical Engineers
Davey Civils
Econotech
IDE Technologies
R&B Engineering
Clancy

Work with us

Site-based planning engineers: Sussex, Hampshire and Kent.

CPMP is recruiting site-based planning engineers for a long-term water and wastewater framework across the South East. You would be embedded with the contractor's team, planning in P6 on live NEC work, with a director behind you.

What we look for

  • Site experience in civils, water or utilities, and the wish to stay close to the work
  • Primavera P6, or the aptitude to learn it quickly with our training
  • NEC awareness: what a clause 31 programme is and why it matters
  • Based in, or able to work in, Sussex, Hampshire or Kent

Email hello@cpmp.co.uk with the subject "Planning engineer". A director reads every application.

Want to talk to a director rather than a sales team?

Brief us in two minutes and Shane or Ben will call you back within one working day.