Planners who keep your programme accepted, honest and on time.
CPMP embeds experienced Primavera P6 and NEC planners with contractors and subcontractors, from two days a month to a full PMO team. No salaries, licences, vehicles or IR35 exposure, just the programme done properly.
Three ways to work with us
Scale planning up and down with the job, without carrying the overhead.
Retained planning support
A named planner who knows your job, on a fixed number of days each month: progress updates, reporting, delay tracking and clause 31 and 32 submissions that get accepted.
- Monthly programme update and narrative
- Progress and look-ahead reporting
- Delay and change tracking
- Same planner every month
Surge capacity
A dedicated team to deliver a tender programme, set up a PMO or build a recovery schedule against a hard deadline, then stand down.
- Tender and bid programmes with 4D where it wins work
- PMO and P6 set-up on new frameworks
- Recovery and acceleration programmes
- Scales from one planner to a full team
One-off specialist work
Forensic delay analysis, claims and expert reports, NEC programme acceptance reviews, P6 implementation and training.
- Forensic delay analysis and EOT claims
- Expert witness reports
- Rebuilding a rejected programme
- Training in P6, Asta, MS Project, CEMAR and NEC programme submissions
Why contractors choose CPMP
Senior planners who have stood on the tunnel face, not just in front of the Gantt chart.
Both directors came up through site engineering and still plan every week. That shows in programmes that get accepted first time and in delay analysis a Project Manager cannot wave away.
Directors who still plan
Both directors came up through site and still run programmes. You get senior judgement, not a junior with a licence.
Flexible without the overhead
No salaries, software licences, vehicles or IR35 exposure. Scale from two days a month to a full PMO team and back.
Programmes that get accepted
We build to clause 31.2, keep the critical path honest and write the narrative, so the Project Manager has no reason to refuse.
Delay analysis grounded in site
Forensic analysis (BTEC Level 7) by people who have been the engineer on the tunnel face, not just the analyst in the office.
The tools your client uses
Primavera P6, Synchro 4D, Asta, MS Project, CEMAR, AutoCAD and Revit, in whatever format the contract demands.
A network when it is not us
If a job needs a skill we do not carry in-house, we know who does, and we will say so.
A Six Sigma mindset
Led by a Six Sigma Black Belt: we cut the waste and the risk out of how the programme is run, and measure the result.
Free tools that work while you wait
Built by planners, for the week the programme is due.
Programme checker
Drop a P6 XER for a free health check in seconds: pass, warning and fail counts across the DCMA 14-point assessment and clause 31.2, and your three biggest issues. The full XER review, with every offending activity and plain-English commentary, is £79 plus VAT. Programmes from Microsoft Project, Asta or other tools can have a PDF review for £29 plus VAT.
Check a programme freeNEC notice drafting
Describe what happened and get a correctly referenced early warning or compensation event notice as a Word file, with the clause 61.3 eight-week clock worked out for you. Free.
Draft a notice230+ NEC guides and scenarios
Plain-English answers for contractors and subcontractors new to NEC, including "this happened, what should I do" scenarios. Search them instantly from any page with Ctrl K.
Search the guidesSectors
Planned in the sectors where the programme is the contract.

Water and wastewater
AMP frameworks, treatment works, pumping stations, outages and commissioning.

Utilities
Diversions, live networks, permits and third-party dependencies.

Tunnelling and shafts
Drives, shafts, cross-passages and ground risk.
Possessions, traffic management phasing and highway authority reporting.05Rail and stations
Station upgrades, step-free access and possession-driven programmes.06Energy
Substations, outages and shutdown windows.07Education and buildings
Academies and buildings delivered to term-time deadlines.
Tools we work in: Primavera P6, Synchro 4D, Asta Powerproject, Microsoft Project, CEMAR, AutoCAD, Revit, Power BI.
Led by two directors
You deal with the people who do the work.
CPMP is 18 planners led by Shane Stanford and Ben Cluer. Shane leads delay analysis, claims and P6 implementation; Ben runs the site-based teams across the South East.
Co-owner and director
Shane Stanford
Six Sigma Black Belt planning manager and delay analyst with over 20 years in UK civil engineering. Shane has planned and engineered the A3 Hindhead Tunnel, Crossrail at Farringdon, Vauxhall Station step-free access, water and wastewater schemes and a run of academy builds with Balfour Beatty.
Co-owner and director
Ben Cluer
Ben has been a planning engineer since 2001, in utilities and planning consultancy before running his own practice from 2015 and co-founding CPMP in 2020. He leads CPMP's planning teams on the ground across the South East, including the site-based planners embedded on a major water and wastewater framework.
Tell us what is going wrong with the programme. We will tell you straight whether we can help.
About three minutes to brief us. A director reads every brief and replies within one working day.
