NEC programme submission checklist
The clause 31.2 content list, the 14 schedule quality checks a Project Manager will run, and the submission cycle to diarise. Two pages to pin above the desk.
2 pages, PDFWritten by CPMP plannersNo mailing list
Where should we send it?
Enter your name and work email and the PDF downloads straight away.
What is in it
- The clause 31.2 content list, item by item, with tick boxes
- Five habits that make a programme easy to accept
- The 14 DCMA schedule quality checks with the common thresholds
- The submission cycle and time bars to diarise, with clause references
Prefer to check the programme itself? The free health check runs all 24 checks on your XER in seconds, and the clause 31 guide explains each item.