Services

Planning capability without the overhead.

Experienced Primavera P6 and NEC planners who embed with your team on terms that fit the job. No salaries, software licences, vehicles or IR35 exposure. A director reads every brief and replies within one working day.

NEC3 · NEC4 · JCT18 planners, two directorsP6, Synchro 4D, Asta, MS Project, CEMAR

What we deliver

Everything a programme needs, from the bid to the final account.

Six disciplines under one roof: tender planning, construction planning, 2D and 3D design, project management, site engineering and claims assessments.

Programmes

  • Tender and bid programmes, with 4D in Synchro where it wins work
  • Construction programmes and monthly updates
  • Clause 31 and 32 submissions and the narrative that goes with them
  • Recovery and acceleration programmes
  • NEC programme acceptance reviews
  • Rebuilding a rejected programme so it is accepted

Claims and disputes

  • Forensic delay analysis
  • Extension of time claims under NEC and JCT
  • Expert witness reports
  • Compensation event quotations and time impact

Set-up and systems

  • PMO set-up on new frameworks
  • Primavera P6 implementation, coding and reporting
  • CEMAR support and programme submissions
  • Training in P6, CEMAR, Asta and MS Project

Design and site

  • 2D and 3D design
  • 3D take-offs from models
  • Site engineering and setting out
  • Point cloud surveys

From two days a month

Retained planning support

A named planner who knows your job, on a fixed number of days each month: progress updates, reporting, delay tracking and clause 31 and 32 submissions that get accepted.

Who it is for

Contractors and subcontractors with a live NEC or JCT job that needs a proper programme every month, but not a full-time planner.

How it starts

Brief us, speak to a director within one working day, meet the planner we propose, agree the days. The first visit is usually a programme health check so we know what we are inheriting.

Typical shape

From two days a month on a single contract, up to several days a week across a framework. The days flex with the job and the same planner stays on it.

What you get

A named planner who learns your job and keeps it. Progress captured on site, the programme updated, the narrative written and the clause 32 submission in on time, every period.

  • Monthly programme update and narrative
  • Progress and look-ahead reporting
  • Delay and change tracking
  • Same planner every month
Ask about retained support →

A team in days, not months

Surge capacity

A dedicated team to deliver a tender programme, set up a PMO or build a recovery schedule against a hard deadline, then stand down.

Who it is for

Bid teams with a tender deadline, frameworks that need a PMO standing up, and projects that have lost time and need a credible recovery programme fast.

How it starts

Tell us the deadline. We confirm within one working day who can start and when, and a director leads the first session with your team.

Typical shape

One planner to a full team, in days rather than months, for the weeks the pressure is on. When the deadline passes, the team stands down and you keep what was built.

What you get

A team sized to the deadline, led by a director. Tender programmes with method narrative and 4D where it helps the bid, PMO and P6 set-up, or a recovery programme the Project Manager will accept.

  • Tender and bid programmes with 4D where it wins work
  • PMO and P6 set-up on new frameworks
  • Recovery and acceleration programmes
  • Scales from one planner to a full team
Brief a surge team →

Fixed scope, fixed fee

One-off specialist work

Forensic delay analysis, claims and expert reports, NEC programme acceptance reviews, P6 implementation and training.

Who it is for

Commercial managers, directors and legal teams who need a piece of work done to a standard that will survive scrutiny, with a clear scope and a clear price.

How it starts

Send us what you have. We scope the work, say what it will cost and how long it will take, and only start once you have agreed both.

Typical shape

Fixed scope, fixed fee. Led by Shane Stanford, who holds a BTEC Level 7 in forensic delay analysis and has been the engineer on the job as well as the analyst in the office.

What you get

Forensic delay analysis and EOT claims, expert witness reports, NEC programme acceptance reviews, rebuilding a rejected programme, P6 implementation and training for your team.

  • Forensic delay analysis and EOT claims
  • Expert witness reports
  • Rebuilding a rejected programme
  • P6, CEMAR and NEC training for your team
Scope a piece of work →

How a secondment works

From brief to a planner on your job, with a director on the phone at every step.

No agency search, no three-month recruitment, no finding out on day one that the CV did not match the person.

  1. Day 0

    Brief us

    Two minutes on the contact form, or a phone call. Tell us the contract form, the software, the key dates and what is going wrong.

  2. Within one working day

    A director calls you

    Shane or Ben rings to understand the job and says straight whether we can help. If we cannot, we will point you to someone who can.

  3. Next

    Planner proposed, with CV

    We propose the planner whose sector and software experience fits, send their CV and put you on a call with them before anything is agreed.

  4. Then

    Start date and terms agreed

    Days per month or a team, where they sit, who they report to. Outside IR35 where the engagement allows; we advise on the right model for the role.

  5. Every week

    Weekly check-in

    A director checks in with you and with the planner each week, so a problem is fixed in days rather than discovered at the month end.

  6. Any time

    Swap or scale at short notice

    If the fit is wrong we change the planner. When the job grows or shrinks, the days follow it. You are not locked into a headcount.

  7. Leave and sickness

    Continuity cover

    When your planner is away, another CPMP planner who has already been briefed on the job steps in, so the monthly update still goes in.

Compare your options

CPMP against hiring, a big consultancy and an agency contractor.

A fair comparison. Each route is the right answer for somebody; this shows where each one is strong.

What mattersCPMPHire a plannerBig consultancyAgency contractor
Senior involvementA director reads every brief, calls you back and stays close to the jobAs senior as the person you can attract and affordSenior at the pitch; delivery usually passes to a project teamThe individual only; the agency places and invoices
Scale up and downTwo days a month to a full team, and back, at short noticeSlow: recruitment to add, notice and redundancy to reduceYes, usually above a minimum team size and termOne person at a time; each change is a new search
Continuity when someone is offCover from a briefed CPMP plannerNone unless you employ twoUsually covered within the teamNone; the role is empty until they return
Software licencesWe carry our own P6, Synchro 4D, Asta and MS ProjectYou buy and maintain themCarried by the consultancyOften yours to provide
IR35 and employment riskA company-to-company contract; outside IR35 where the engagement allows, and we advise on the modelNo IR35 question; full employment cost and obligationsA company-to-company contractThe status determination and its risk usually sit with you
NEC depthClause 31 and 32 submissions every month; 236 published NEC guidesDepends on the individualOften strong, with contract specialists on callVaries by the individual
Delay analysis in-houseYes, forensic analysis to BTEC Level 7, by people who have run sitesRarely; a planner is not usually an analystYes, often a separate claims team at a higher rateRarely
Free tools and guidesProgramme checker, NEC notice tool and 236 guides, open to anyoneNoSome publish reports and webinarsNo
Response timeA director replies within one working dayWeeks to months to recruitA proposal cycle, often weeksDays to receive CVs
Best whenThe workload moves with the job and the programme is contractualYou have steady, full-time planning work for yearsYou need a broad, multi-discipline change programmeYou want one long-term person and will manage them yourself

Swipe the table sideways on a phone. IR35 is a matter of fact for each role: we advise on the right model but the determination is made case by case.

Things nobody else gives you

We looked at every planning consultancy we compete with. None of them offer all of this.

18

A team you can see

18 experienced planners and two named directors. Most planning consultancies show no team at all; you find out who you are getting after you sign.

3

Free working tools

A free programme health check that runs the clause 31.2 content check and the DCMA 14-point assessment on your XER in seconds, an NEC notice tool that drafts early warnings and compensation event notices as Word files, and a two-page programme submission checklist to download.

236

Plain-English NEC guides

Written for contractors and subcontractors who are new to NEC, including "this happened, what should I do" scenarios. Searchable from any page.

1

A named response time

Most firms say "get in touch". We say a director replies within one working day, and the contact page tells you what happens after that.

2

Directors who still plan

Both directors came up through site engineering and still run programmes every week. The senior judgement you buy is the judgement that turns up.

6σ

A Six Sigma mindset

Shane is a Six Sigma Black Belt. We look for the waste and the risk in how a programme is run, not just in the programme, and we measure the outcome: fewer refusals, faster updates, claims that stand.

+

A network when it is not us

Twenty years in UK civils builds a wide industry network. If a job needs a skill we do not carry in-house, we know who does, and we will say so rather than stretch.

→

Try the tools now

Check a programme, draft a notice or search the guides. No sign-up for the guides or the notice tool.

Tools and contracts

The software your client uses, in the format the contract demands.

Primavera P6Synchro 4DAsta PowerprojectMicrosoft ProjectCEMARAutoCADRevitPower BINEC3NEC4JCT

Programmes

Primavera P6 is our default. Asta Powerproject and Microsoft Project where the contract or the client asks for them, with clean import and export between all three.

4D and bid graphics

Synchro 4D linked to the P6 programme, so the sequence in the bid is the sequence in the schedule. Used where it wins work, not as decoration.

Contract administration

CEMAR programme submissions, early warnings and compensation events handled in the system your client runs, with the programme and the register telling the same story.

Design and reporting

AutoCAD and Revit for 2D and 3D design and take-offs. Power BI for progress dashboards built from the P6 data rather than typed in afterwards.

Training is available in P6, CEMAR, Asta and MS Project for your own team. Ask about training.

Contractors and clients our planners have worked with

CMDP, a Costain-MWH joint venture
Costain
Balfour Beatty
Bechtel
BAM Nuttall
Joseph Gallagher
London Underground
Ferrovial
Southern Water
Thames Water
Crossrail
AMEC
Anglian Water
McLaren Construction Group
ALS Civil & Mechanical Engineers
Davey Civils
Econotech
IDE Technologies
R&B Engineering
Clancy

Questions we get asked

Straight answers before you pick up the phone.

How fast can you start?

A director calls you back within one working day of your brief. For retained support we usually propose a planner with their CV in the days that follow. Surge teams are assembled in days, not months, because the planners already work for us.

Do you work on site?

Yes. Most of our planners are site-based, embedded with the project team, and we run site-based planning teams across Sussex, Hampshire and Kent. Where a job suits it we work a mix of site days and remote days from Horsham, and specialist work such as delay analysis is largely desk-based.

What is the minimum commitment?

Retained support starts at two days a month. One-off specialist work is a fixed scope with no ongoing commitment at all. Surge work runs for as long as the deadline needs and then stands down.

Can we keep the same planner?

That is the point of retained support: one named planner who knows your job, every month. If they are on leave, a CPMP planner who has already been briefed covers for them. If the fit is ever wrong, we change the planner rather than lose the job.

Do you work on NEC3 and NEC4?

Both, every month, including clause 31 and 32 programme submissions, acceptance reviews and compensation event quotations. The differences between the editions matter for programme acceptance and we know where they bite.

Which software do you use?

Primavera P6, Synchro 4D, Asta Powerproject, Microsoft Project, CEMAR, AutoCAD, Revit, Power BI. We work in whatever format the contract and your client demand, and we bring our own licences for P6, Synchro 4D, Asta and MS Project.

Do you do JCT?

Yes. JCT programmes are not usually a contract document in the way NEC programmes are, but the master programme, the monthly update and a properly evidenced extension of time claim still decide who carries the delay. We produce all three.

How do we pay?

Retained and surge work is billed by the day and invoiced monthly. Specialist work is a fixed fee agreed before we start. Everything is a company-to-company contract with CPMP Ltd.

Tell us what the programme needs. We will say within one working day whether we are the right people.

Two minutes to brief us. A director reads it, calls you back and proposes the planner or the team.