Free tool for planners

How healthy is your P6 programme?

Upload an XER and see a score in seconds: 14 DCMA schedule-quality checks, the clause 31.2 content a Project Manager looks for, and six NEC checks for Completion Date, Key Dates, sections, time risk, acceptance periods and holidays.

Free, no cardXER processed in memory, not storedBuilt by NEC planners

Drop your P6 XER here

Or choose a file. Up to 20 MB. One project per file.

Your XER is processed in memory and is not stored.

01

Export from P6

File, Export, Primavera PM (XER). One project per file, up to 20 MB. Run the schedule first so dates and float are current.

02

See the score

Every check shows PASS, WARNING or FAIL with its result and threshold. The score is plain arithmetic, explained under the number.

03

Get the full report

Confirm your email and download a branded PDF that names the activities behind each problem.

This is a practical health check for planners, not legal or contractual advice. It shows whether items are present, not whether they are right. We process your XER in memory. The results are available for 48 hours so you can download the PDF.

Free P6 XER health check for NEC programmes | CPMP