236 free guides, 79 of them scenarios
NEC help you can actually find
Type what happened, a clause number or a word you keep hearing. Plain-English answers written by planners who do this work every day.
NEC by sector
7 guidesHow NEC is used on water, wastewater, utilities, tunnelling, highways, rail and energy work.
Working under NEC on water and wastewater projects
Practical NEC contract points for water work: live assets, outages, buried structures and ground, weather, commissioning, with a worked outage example.
Read the guide →Working under NEC on highways schemes: road space, utilities and sections
Practical NEC points for highways contractors: road space bookings, utility diversions, unknown services, weather, phased opening and term maintenance.
Read the guide →Working under NEC on rail projects: possessions, Key Dates and commissioning
How NEC treats rail access windows, lost possessions, urgent decisions, testing and commissioning, with a worked example and the records to keep.
Read the guide →Working under NEC on energy and nuclear projects: quality, change and long contracts
Practical NEC points for energy and nuclear work: quality plans, hold points, changing requirements, choice of Option, and keeping records over many years.
Read the guide →NEC on tunnelling projects: what to plan for
How NEC contracts meet the realities of tunnelling: ground risk, long linear programmes, shafts, third parties and the pressure points to plan around.
Read the guide →NEC on utilities projects: working with diversions, networks and third parties
How NEC contracts behave on utilities work: network outages, diversions, third-party dependencies, permits and the pressure points to plan around.
Read the guide →NEC on wastewater projects: plant, outages and commissioning
How NEC contracts meet wastewater work: live treatment works, outages, process commissioning, ground and third parties, and where to plan carefully.
Read the guide →