236 free guides, 79 of them scenarios

NEC help you can actually find

Type what happened, a clause number or a word you keep hearing. Plain-English answers written by planners who do this work every day.

Popular:Anywhere on the site: Ctrl K

Showing 17 of 236 guides in Communications and records

Communications and records

17 guides

Notices, instructions, time bars, registers and keeping evidence.

Scenario4 min read

An instruction conflicts with the Scope or the contract: what to do

You have been given an instruction that seems to contradict the Scope or the contract. How to query it, protect yourself and notify any compensation event.

Read the guide →
3 min read

What records to keep on an NEC contract: a practical checklist

A practical checklist of the records to keep on an NEC project and when to capture them, so programme, payment and compensation event claims hold up.

Read the guide →
Scenario4 min read

Notice sent by email, not the communication system: is it valid?

You emailed a notice but the NEC contract requires the communication system. What the clause 13 position is and how to fix it quickly.

Read the guide →
4 min read

Running NEC communications day to day: notices, logs and systems

A practical guide to clause 13: what counts as a valid communication, keeping notices separate, and the log that stops you losing an entitlement.

Read the guide →
4 min read

How to track NEC reply periods so deadlines never slip

Set up a tracker for NEC periods for reply: what to record, what each missed deadline triggers, and a worked example with dates.

Read the guide →
3 min read

NEC time bars: which deadlines really cost you the right

Which NEC deadlines are true time bars, which only reduce what you recover, the exceptions to the eight-week rule, and how to stay safe.

Read the guide →
4 min read

NEC time limits at a glance: the periods that catch contractors out

A quick-reference set of NEC time limits for notices, quotations, programmes, payment and completion, with the clause for each and the NEC3 differences.

Read the guide →
3 min read

Which registers to keep on an NEC contract, and what goes in them

The eight simple logs that let you prove what happened and when on an NEC job, with the fields to record and how to keep your list matching the Client's.

Read the guide →
3 min read

NEC letters that work: what each one should say

What every NEC letter needs, plus plain wording you can adapt for replies, chasers, defects, programme requests and extensions of time for a reply.

Read the guide →
3 min read

The forms and documents you need on an NEC contract

Which NEC documents come ready-made, which you must create yourself, who issues each one and what a notice or certificate must do to be valid.

Read the guide →
3 min read

Is a spreadsheet enough to run an NEC contract?

When a spreadsheet works for tracking NEC notices and replies, how it fails, and the safeguards that make one reliable, including a simple reply date formula.

Read the guide →
3 min read

Keeping NEC records that will stand up when it matters

Which records to keep on an NEC job, who should own them, what makes a record usable as evidence, and the extra records cost-based options demand.

Read the guide →
Scenario3 min read

Your request for information has gone unanswered: what to do under NEC

How to turn an ignored RFI into something the NEC contract recognises, protect your programme, and decide whether a late answer is worth a compensation event.

Read the guide →
Scenario3 min read

Someone told you to change the work out loud: can you start?

What to do when the Project Manager gives a verbal instruction under NEC: get it in writing, protect your compensation event, handle urgent safety work.

Read the guide →
Scenario3 min read

Client staff are giving your site team orders: how to handle it under NEC

What to do when the Client instructs your site team directly instead of through the Project Manager, and how to protect your time and money.

Read the guide →
Scenario3 min read

Drawings say one thing and the specification another: who wins under NEC?

What to do when NEC contract documents conflict, how the Project Manager's ruling is priced, and why the reading that favours you can matter.

Read the guide →
Scenario3 min read

The Project Manager is paid by the Client: can you expect fair decisions?

How far an NEC Project Manager has to act by the book rather than for the Client, and what to do if you think decisions are being steered.

Read the guide →
NEC guides and scenarios, searchable | CPMP