Programmes and time
23 guidesBuilding, submitting and defending an NEC programme.
NEC Clause 31 programme checklist
A practical checklist of what clause 31.2 says your NEC programme must show, so it is not sent back at the first review.
Read the guide →Why NEC programmes are not accepted
The four grounds a Project Manager can use to refuse a programme under clause 31.3, and the practical mistakes behind each one.
Read the guide →P6 schedule health check using DCMA-style metrics
The 14 DCMA schedule quality checks explained, with typical thresholds and how to run each one in Primavera P6.
Read the guide →Float and time risk allowance explained
What float and time risk allowance mean under NEC, why clause 31.2 asks for both, and how they affect compensation events.
Read the guide →Revised programme submission timeline cheat sheet
When the Contractor must submit programmes under clause 31 and 32, how long the Project Manager has to reply, and what to diarise.
Read the guide →NEC3 versus NEC4: what changed for programmes
The differences between NEC3 and NEC4 that matter when you build, submit and manage a programme.
Read the guide →Delay analysis basics for NEC contractors
A plain-English introduction to the main delay analysis methods and how NEC assesses time on compensation events.
Read the guide →The Project Manager has not accepted my programme: what now?
What to do when your NEC programme is not accepted: check the reply, fix the stated reasons, resubmit and protect your position on time.
Read the guide →The Project Manager has not replied to my programme: what now?
A practical guide to chasing a silent Project Manager after a programme submission under NEC, including reply periods, records and escalation.
Read the guide →How to write a programme narrative and schedule of changes
How to write a short programme narrative and schedule of changes that explains your NEC programme and makes it easier for the Project Manager to accept.
Read the guide →My programme now shows we will finish late: do I submit it?
What to do when an updated NEC programme forecasts completion after the Completion Date: honest submission, causes, notices and records.
Read the guide →Key Dates and sectional completion explained for programme builders
How Key Dates and sectional completion work in an NEC programme, and how to build, show and protect them when planning and revising.
Read the guide →The Accepted Programme explained: which programme counts and why it matters
How a programme becomes the Accepted Programme under NEC, what it controls for delay and access, and the mistakes that leave contractors exposed.
Read the guide →Your first NEC programme: when it is due and how the 25% deduction works
When to submit your first NEC programme under clause 31.1, what ends the 25% payment deduction, and a practical order of work for getting it in.
Read the guide →When the Project Manager ignores your programme: treated acceptance under NEC4
How a silent Project Manager can end up with your NEC4 programme treated as accepted, the timeline, the steps to take and the open questions.
Read the guide →Terminal float under NEC: the time buffer at the end of your programme
What terminal float is, why NEC's delay rule protects it, what eats into it and how to show it honestly on your programme.
Read the guide →Acceleration under NEC clause 36: how a Client buys an earlier Completion Date
How NEC acceleration works for contractors: the quotation process in NEC3 and NEC4, what is not acceleration, and how to price a request.
Read the guide →How the programme measures delay from a compensation event
The step-by-step method NEC uses to turn a compensation event into extra time, with what goes wrong when there is no usable programme.
Read the guide →NEC access dates: when you can start on site and what happens if access is late
How starting dates and access dates work in NEC, the 'later of' rule that catches contractors out, and how late access becomes a compensation event.
Read the guide →Behind programme on an NEC contract: what to tell the Project Manager
What to say, in what order, when your NEC works are slipping: early warning, revised programme, and keeping any compensation event claim intact.
Read the guide →No accepted programme on an NEC job: how compensation events get assessed
What happens to time and money for a compensation event when the Project Manager has not accepted your programme, and how to fix the gap.
Read the guide →Client change used up our float: can we still claim under NEC?
When a compensation event eats float on your programme, what you can and cannot recover in time and money, and what to do before the notice window closes.
Read the guide →Missed an NEC Key Date: what it can cost you and how to limit it
What clause 25.3 lets the Client recover when you miss a Key Date, how to test the Project Manager's figure and what to do while the date is still ahead.
Read the guide →