236 free guides, 79 of them scenarios

NEC help you can actually find

Type what happened, a clause number or a word you keep hearing. Plain-English answers written by planners who do this work every day.

Popular:Anywhere on the site: Ctrl K

Showing 23 of 236 guides in Programmes and time

Programmes and time

23 guides

Building, submitting and defending an NEC programme.

3 min read

NEC Clause 31 programme checklist

A practical checklist of what clause 31.2 says your NEC programme must show, so it is not sent back at the first review.

Read the guide →
3 min read

Why NEC programmes are not accepted

The four grounds a Project Manager can use to refuse a programme under clause 31.3, and the practical mistakes behind each one.

Read the guide →
3 min read

P6 schedule health check using DCMA-style metrics

The 14 DCMA schedule quality checks explained, with typical thresholds and how to run each one in Primavera P6.

Read the guide →
4 min read

Float and time risk allowance explained

What float and time risk allowance mean under NEC, why clause 31.2 asks for both, and how they affect compensation events.

Read the guide →
3 min read

Revised programme submission timeline cheat sheet

When the Contractor must submit programmes under clause 31 and 32, how long the Project Manager has to reply, and what to diarise.

Read the guide →
3 min read

NEC3 versus NEC4: what changed for programmes

The differences between NEC3 and NEC4 that matter when you build, submit and manage a programme.

Read the guide →
3 min read

Delay analysis basics for NEC contractors

A plain-English introduction to the main delay analysis methods and how NEC assesses time on compensation events.

Read the guide →
Scenario4 min read

The Project Manager has not accepted my programme: what now?

What to do when your NEC programme is not accepted: check the reply, fix the stated reasons, resubmit and protect your position on time.

Read the guide →
Scenario4 min read

The Project Manager has not replied to my programme: what now?

A practical guide to chasing a silent Project Manager after a programme submission under NEC, including reply periods, records and escalation.

Read the guide →
3 min read

How to write a programme narrative and schedule of changes

How to write a short programme narrative and schedule of changes that explains your NEC programme and makes it easier for the Project Manager to accept.

Read the guide →
Scenario3 min read

My programme now shows we will finish late: do I submit it?

What to do when an updated NEC programme forecasts completion after the Completion Date: honest submission, causes, notices and records.

Read the guide →
5 min read

Key Dates and sectional completion explained for programme builders

How Key Dates and sectional completion work in an NEC programme, and how to build, show and protect them when planning and revising.

Read the guide →
4 min read

The Accepted Programme explained: which programme counts and why it matters

How a programme becomes the Accepted Programme under NEC, what it controls for delay and access, and the mistakes that leave contractors exposed.

Read the guide →
3 min read

Your first NEC programme: when it is due and how the 25% deduction works

When to submit your first NEC programme under clause 31.1, what ends the 25% payment deduction, and a practical order of work for getting it in.

Read the guide →
3 min read

When the Project Manager ignores your programme: treated acceptance under NEC4

How a silent Project Manager can end up with your NEC4 programme treated as accepted, the timeline, the steps to take and the open questions.

Read the guide →
4 min read

Terminal float under NEC: the time buffer at the end of your programme

What terminal float is, why NEC's delay rule protects it, what eats into it and how to show it honestly on your programme.

Read the guide →
3 min read

Acceleration under NEC clause 36: how a Client buys an earlier Completion Date

How NEC acceleration works for contractors: the quotation process in NEC3 and NEC4, what is not acceleration, and how to price a request.

Read the guide →
4 min read

How the programme measures delay from a compensation event

The step-by-step method NEC uses to turn a compensation event into extra time, with what goes wrong when there is no usable programme.

Read the guide →
4 min read

NEC access dates: when you can start on site and what happens if access is late

How starting dates and access dates work in NEC, the 'later of' rule that catches contractors out, and how late access becomes a compensation event.

Read the guide →
Scenario4 min read

Behind programme on an NEC contract: what to tell the Project Manager

What to say, in what order, when your NEC works are slipping: early warning, revised programme, and keeping any compensation event claim intact.

Read the guide →
Scenario4 min read

No accepted programme on an NEC job: how compensation events get assessed

What happens to time and money for a compensation event when the Project Manager has not accepted your programme, and how to fix the gap.

Read the guide →
Scenario3 min read

Client change used up our float: can we still claim under NEC?

When a compensation event eats float on your programme, what you can and cannot recover in time and money, and what to do before the notice window closes.

Read the guide →
Scenario4 min read

Missed an NEC Key Date: what it can cost you and how to limit it

What clause 25.3 lets the Client recover when you miss a Key Date, how to test the Project Manager's figure and what to do while the date is still ahead.

Read the guide →