Early warning and risk
17 guidesSpotting problems early, liabilities, insurance and risk allocation.
Early warning register template
How early warnings work under NEC, what to record in the register, and a template you can copy.
Read the guide →I have noticed a problem that is not a delay yet: do I give an early warning?
When to give an NEC early warning, what it must cover, how to word it, and why giving one is almost always safer than waiting.
Read the guide →Running an early warning meeting that actually reduces risk
How to prepare, run and follow up an NEC early warning meeting so risks are owned, actions are recorded and the programme is protected.
Read the guide →I gave an early warning and the Client or Project Manager ignored it
What to do when an NEC early warning gets no response: follow up, record the position, mitigate, and protect your rights on time and cost.
Read the guide →What an NEC early warning is and when you must give one
A plain guide to the NEC early warning duty: what triggers it, who owes it, how it differs from a compensation event notice, and the cost of staying silent.
Read the guide →NEC early warning notice: wording you can copy
A ready-to-use early warning layout for NEC4 contracts with a filled-in example and notes on adapting it for NEC3, subcontracts and short forms.
Read the guide →What to raise as an NEC early warning: examples and a quick test
Practical examples of matters that need an NEC early warning, a four-question test for borderline cases and what does not need one.
Read the guide →Who has to give an NEC early warning: contractor, Project Manager, others
Who owes an early warning under NEC, who keeps the register and calls meetings, and how knowledge on site reaches the person who sends notices.
Read the guide →What if you do not give an NEC early warning? The cost explained
How a missing early warning reduces what you recover on a compensation event under NEC, the Disallowed Cost risk, and how to respond to a 61.5 statement.
Read the guide →Early warning mistakes that cost NEC contractors money
The most common errors in giving, writing and following up NEC early warnings, from silence to over-warning, with a simple fix for each.
Read the guide →How early warnings work for NEC subcontractors
Who a subcontractor warns, how warnings travel up and down the chain, and why the subcontract time limits are shorter than the main contract's.
Read the guide →What you are liable for as the contractor under NEC
The four things NEC makes the Contractor liable for, how they sit against the Client's list, what changed from NEC3, and insurance and subcontractors.
Read the guide →What the Client carries under NEC: the clause 80.1 list
The risks NEC puts on the Client, how taking over changes them, and how a Client liability becomes a compensation event for the contractor.
Read the guide →NEC insurance: what the contractor must arrange and prove
A plain guide to the Insurance Table, certificates, joint names, subrogation and excesses under NEC, with a start-of-job checklist.
Read the guide →Who carries the risk under each NEC main option
How cost, quantity and overrun risk shift between Options A to F, a worked comparison and the risks that stay the same whichever option you use.
Read the guide →Will an early warning be read as admitting we are at fault?
Why raising an early warning does not admit blame under NEC, and how to word one so it records the risk without handing the other side a weapon.
Read the guide →Does an early warning protect my compensation event claim?
An early warning and a compensation event notice are different documents. Learn why one does not cover the other and how to avoid the eight-week trap.
Read the guide →