236 free guides, 79 of them scenarios

NEC help you can actually find

Type what happened, a clause number or a word you keep hearing. Plain-English answers written by planners who do this work every day.

Popular:Anywhere on the site: Ctrl K

Showing 50 of 236 guides in Compensation events and change

Compensation events and change

50 guides

Notifying, quoting and assessing compensation events.

4 min read

Compensation event quotation: template and guide

What a clause 62 compensation event quotation must contain, how to price time and money, and a template you can adapt.

Read the guide →
7 min read

How to show a compensation event on the programme, step by step

A worked example with programme pictures: the Accepted Programme, progress to the dividing date, the event inserted, and the dates the quotation claims.

Read the guide →
7 min read

Concurrent delay and compensation events: how to deal with it, step by step

What concurrent delay means, why NEC's prospective method handles most of it, and how to assess time and money when your delay and the Client's overlap.

Read the guide →
4 min read

Compensation events in plain English: what counts under clause 60.1

A plain-English walk through the clause 60.1 list of NEC compensation events, grouped by category, so you can spot a valid event early.

Read the guide →
Scenario4 min read

Told on site to do extra work, nothing in writing: what to do under NEC

A Project Manager or Client's rep verbally asked for extra work. Here is how to protect your position and notify a compensation event.

Read the guide →
Scenario5 min read

Missed the eight-week compensation event deadline: is the claim lost?

What happens if you notify a compensation event after eight weeks, the exception when the Project Manager should have notified it, and what to do now.

Read the guide →
Scenario4 min read

Late Access to Site or Working Areas: What to Do Under NEC

The Client has not given access when your programme needs it. Steps to protect time and money, what to record and when to escalate.

Read the guide →
Scenario5 min read

Hit unexpected ground conditions: what to do under NEC

General guidance on unforeseen ground conditions under NEC: early warning, evidence, notifying a compensation event and why your Contract Data and Scope matter.

Read the guide →
Scenario5 min read

Project Manager rejected my compensation event quotation: what now?

What to do when the Project Manager rejects your NEC compensation event quotation or assesses the event themselves, and how to protect your entitlement.

Read the guide →
4 min read

Compensation event notification checklist: make it stand up

A practical checklist for NEC compensation event notifications covering timing, content, form, evidence and follow-up.

Read the guide →
3 min read

What a compensation event is and why it matters to your price and programme

A plain explanation of NEC compensation events: what they cover, how they replace variations and extensions of time, and a quick test for site events.

Read the guide →
4 min read

NEC4 compensation events listed one by one in plain English

All 21 core NEC4 compensation events in clause 60.1, plus the Option events, with who normally notifies each and how to read the list.

Read the guide →
4 min read

How a compensation event moves from notice to new price and date

The five stages of an NEC compensation event, the time limit at each stage and what you and the Project Manager must do, with a worked timeline.

Read the guide →
3 min read

Preparing an NEC compensation event quotation that gets accepted

What goes into a compensation event quotation, how to handle the programme and alternatives, and the mistakes that get quotations sent back.

Read the guide →
3 min read

What happens when the Project Manager does not reply: treated acceptance

How NEC treated acceptance works for compensation event decisions, quotations, assessments and programmes, with the notice you must send and the timings.

Read the guide →
3 min read

Revised quotations: why the Project Manager asks and how to respond

When a Project Manager can instruct a revised NEC quotation, what good reasons look like, how long it takes and how to reply without wasting three weeks.

Read the guide →
3 min read

When the Project Manager assesses a compensation event instead of you

The four situations in NEC clause 64 where the Project Manager assesses a compensation event, how long they have and what you can do if they fail.

Read the guide →
3 min read

Implementing a compensation event: when your price and dates actually change

How NEC clause 66 makes a compensation event final, what changes in your Prices and dates, and the checklist to close the event out properly.

Read the guide →
3 min read

Notifying a compensation event when you never gave an early warning

Yes, you can notify a compensation event without an early warning under NEC. Learn what it may cost you and how to run both notices together.

Read the guide →
4 min read

Seven worked compensation event examples for contractors

Seven invented NEC4 examples showing which clause applies, who notifies and how the result is worked out, including two events that fail.

Read the guide →
3 min read

The compensation event mistakes that cost contractors money

The common NEC compensation event errors made by contractors and Project Managers, what each costs and the habit that prevents it.

Read the guide →
4 min read

Stop-work and Key Date instructions as a compensation event (60.1(4))

How NEC clause 60.1(4) works when the Project Manager tells you to stop, hold back or re-date work, what to record, and how it is priced.

Read the guide →
4 min read

When the Client or third parties disrupt you: compensation event 60.1(5)

How NEC clause 60.1(5) works when the Client, a utility or another contractor works outside the programme or Scope, with evidence and a priced example.

Read the guide →
3 min read

Late Reply From the Project Manager: Compensation Event 60.1(6)

When a slow answer from the Project Manager or Supervisor becomes a compensation event, and what you need to prove before it is worth notifying.

Read the guide →
3 min read

Weather Under NEC: When Bad Weather Is a Compensation Event

How the one-in-ten-year weather test in clause 60.1(13) works, what to set up in Contract Data, and why most bad weather stays your risk.

Read the guide →
3 min read

Instructed Change to the Scope: Compensation Event 60.1(1)

What counts as a Project Manager instruction changing the Scope, the two exceptions, how it is priced, and the mistakes that cost contractors money.

Read the guide →
3 min read

Unexpected ground and site conditions: compensation event 60.1(12)

How the physical conditions event works, what you are taken to have known at tender, and how to prove only the excess is yours to claim.

Read the guide →
3 min read

Prevention: NEC's version of force majeure (clause 60.1(19))

What counts as a prevention event, why it is hard to prove, and how time and money are assessed when something outside both parties' control stops you.

Read the guide →
3 min read

When the Client Breaches the Contract: Compensation Event 60.1(18)

How the catch-all breach event works, which specific events to try first, and why it pays your cost and Fee rather than damages.

Read the guide →
Scenario3 min read

Late drawings: can you claim a compensation event?

Whether late Issued For Construction drawings give you a compensation event depends on who was meant to supply them and what the programme says.

Read the guide →
Scenario3 min read

Your own designer is late: who carries the cost?

If a designer you appointed delivers late, the delay is normally yours. Here is what to do now, who pays by main Option, and when a Client cause exists.

Read the guide →
Scenario3 min read

Project Manager replied late: is that a compensation event?

A late reply can be a compensation event under 60.1(6), but only a real effect on cost or dates earns you anything. Here is what to check and do.

Read the guide →
Scenario3 min read

Instruction received but no compensation event notified

The Project Manager gave an instruction that changes the Scope but did not notify an event. Here is how to notify it yourself and protect your position.

Read the guide →
Scenario3 min read

Does the time bar still apply if the PM should have notified?

The eight-week time bar is lifted only for events arising from the Project Manager's own communications. Knowing about an event is not enough.

Read the guide →
Scenario3 min read

Notifying a compensation event before it happens

You can notify an event you expect, not just one that has happened. When to do it, when to send an early warning instead, and the knock-on effects.

Read the guide →
Scenario3 min read

No reply to your compensation event notice: notify the failure

If the Project Manager stays silent on your notice, a failure notice starts a short clock after which the event is treated as accepted.

Read the guide →
Scenario3 min read

No reply to your quotation: using clause 62.6

How to turn a Project Manager's silence on your quotation into a treated acceptance, with the deadlines for the ECC and the NEC4 subcontract.

Read the guide →
Scenario3 min read

Cannot price the quotation yet: assumptions and risk allowances

When facts are unknown, ask the Project Manager for assumptions or price the risk, but never let the quotation deadline pass without submitting.

Read the guide →
Scenario4 min read

Pricing a compensation event for work you have already done

How to price a compensation event when the work is finished: what counts as actual cost, what must be forecast, and the evidence to gather.

Read the guide →
Scenario3 min read

Recovering the cost of extra time on site under NEC

NEC has no separate prolongation claim. See how time-related cost goes into the compensation event, what to include and what to leave out.

Read the guide →
Scenario3 min read

Recovering lost productivity (disruption) under NEC

How disruption is priced as part of a compensation event, the output records that prove it, and why you must put it in your first quotation.

Read the guide →
Scenario3 min read

Unmarked utilities on site: is it a compensation event?

What to do when you hit a service that wasn't on any drawing, and how the NEC test for unforeseen physical conditions is applied to it.

Read the guide →
Scenario3 min read

Contaminated ground found on site: your first steps and who pays

What to do when you uncover contamination, and how the NEC physical conditions test and the Site Information decide whether it is a compensation event.

Read the guide →
Scenario3 min read

Can you claim for bad weather under NEC?

Bad weather is a compensation event only if the recorded figures beat the one-in-ten-year test. How to check, what to log, and what stays with you.

Read the guide →
Scenario3 min read

Another contractor is holding you up: can you claim?

When delay by the Client's other contractors, utilities or authorities is a compensation event, and why your Accepted Programme usually decides it.

Read the guide →
Scenario3 min read

The Project Manager has told you to stop work: what next?

Obey the instruction, then protect your position. How an NEC stop work instruction becomes a compensation event, and when your own fault removes it.

Read the guide →
Scenario3 min read

The Client has changed its mind on the design: how you get paid

How a Client change of mind turns into an NEC instruction and compensation event, the proposed-instruction route, and what to do before you act.

Read the guide →
Scenario3 min read

New regulations mean extra work: who pays under NEC?

A change in law after the Contract Date: when Option X2 makes it the Client's cost, when it stays with you, and how to notify.

Read the guide →
Scenario3 min read

A permit or consent is late: who carries the risk under NEC?

NEC has no clause on permits. See how the Scope and the Accepted Programme decide whether a late permit is a compensation event.

Read the guide →
Scenario3 min read

Work is finished but compensation events are still open

How to close out unresolved compensation events after Completion: the cut-offs, who must act next, and how to avoid losing them in the final account.

Read the guide →